Railway Infrastructure

Print

R.F.I. S.p.A.

Value
(€/mln)

Progress

Genova-Ventimiglia. Execution of the requisite contributions to the final planning stages of the rail link between the mountain pass lines and the Genova – Voltri harbour and dock area, construction of railway site and the civil works involved.

202

Completed 03/01

Premosello–Domodossola -Iselle. Improvement and widening of the tunnels.

45

Completed 06/02

Roma-Napoli. High Speed service. Entry into the urban centre at the Naples Central station with road-works, road structures, railway track laying and technological systems for the alternative route for Cassino, and for Salerno and the 2nd Portion of the new Naples line.

96,5

Completed 06/08

Genova-Ventimiglia. Execution of civil works, raised structures and work on electrical power lines and LFM, the moving of the section of the railway line between the area of Castelluccio and the Branega stream.

17,1

Completed 07/06

Orte-Falconara. Construction design and execution of works for the doubling of the railway line between the station of Fabriano and the railway lay-by at km. 228.

70,7

Completed 08/10

Caserta–Foggia.Construction design and execution of works for the doubling of the railway line on the section between the chainage point at km 6+200 and the chainage point km 29+150.

165

In corso

A.C. Venice. Execution of civil works, railway track laying on the section between the Pozzuolo fork and the Treviglio intersection of the new AC Venice line.

125

Completed 12/09

Messina-Palermo. Granting of integrated support works required for the doubling of the railway line at S. Agata S.Filippo del Mala, 1st operational stage Terme Vigliatore - Milazzo.

248

Completed 12/08

Florence-Prato. Quadruple track on the Firenze-Rifredi - Castello section and platforms repair works at the Rifredi station.

11,9

Completed
06/05

Crevalcore-S. Felice Sul Panaro. Doubling of the railway line of the Poggio Rusco – Nogara section. Execution of civil works, environmental impact mitigation, LFM, T.E.

300

Completed 08/09

Bologna-Venice. Doubling of the railway of the Crevalcore-Nogara section. Execution of civil works, mitigation of environmental impact, L.FM, T.E.

100

Completed 10/09

Milan-Naples. High Speed Railway line TAV 43, Portion 9 from km 11+079 to km 17+854 (Anzola dell'Emilia).

101

In corso

Reggio Calabria-Metaponto. Section Pellaro-Capodarmi.

66

Completed
10/08

Portomaggiore-Dogato Di Ostellato. Railway line connection.

11

-

Bari-Lecce. Tuturano-Surbo section

10

-

Bari-Lecce. Doubling of the railway line of the Mola-Fasano section between km 667+958 and 681+150, km 682+420 and 688+680, km 689+390 and 700+100.

11

Completed
03/04

.